Projects

Choctaw Storage and Pump Station

Civil Engineering, Electrical Engineering, Land Surveying, Public Works


Services
Civil Engineering
Electrical Engineering
Land Surveying

Market
Public Works

Location
Baton Rouge, LA

Forte and Tablada, Inc. was subcontracted with Camp, Dresser and Mckee to perform a ROW survey for the western portion from Pump Station 52 to the Choctaw Storage Facility. Work also included site and boundary for Pump Station 52 and the 40-acre site and boundary for the Choctaw Storage Facility.

We also provided engineering design of 10,500 feet of 42 inch gravity/force main. The force main is designed to pump in one direction as the storage tank fills and gravity flow as the storage tank drains. We determined methods of construction including pipe routing, utility research, tunneling methods, pipe materials, and traffic control plans and also provided construction administration.

Forte and Tablada, Inc. also provided electrical work that included providing conduit, wire, and field connections, a raceway system, specialty cable systems, Data Highway Cables and wiring for HVAC equipment. We will also provide modifications to existing motor control centers, switchboards, switchgear, panel boards, and motor controllers.


Similar Projects See All