City of Central Sidewalks
Civil Engineering, Land Surveying, Transportation

Services
Civil Engineering
Land Surveying
Market
Transportation
Location
Central, LA
Forte and Tablada, Inc. provided topographic surveying, engineering construction plans, and construction observation for the construction of sidewalks on the east side of Sullivan Road spanning from Virgil Jackson Avenue to 150 feet north of Reed Ave, sidewalk construction on the east side of Sullivan Road spanning from Central Woods Avenue to Wax Road and construction of sidewalk on the south side of Wax Road spanning from Sullivan Road to Banway Drive.
Site 1: 3,260 linear feet of 5-foot of sidewalk on eastside of Sullivan spanning from Virgil Jackson Avenue to 150 feet North of Reed Avenue
Site 2: 910′ +/- on the eastside of Sullivan spanning from Central Woods to Wax
Site 3: 4,410 +/- of 5 feet sidewalk on the south side of Wax spanning from existing sidewalk on the north side of Wal-Mart to Banway Drive
A total of approximately 4,170 feet of sidewalk was constructed along Sullivan and approximately 4,410 feet of sidewalk was constructed along Wax Road.
Similar Projects See All
-
Westside Community College Forte and Tablada, Inc. provided civil and electrical engineering design services as part of a design team with Coleman Partners Architects, LLC. The civil/site...
More
-
Rosedale Hurdle Road Drainage CDBG Grant Forte and Tablada, Inc. provided engineering design services and assistance with the CDBG application for drainage improvements in the Village of Rosedale. The scope of...
More