Willis-Knighton – Proton Therapy Center

Forte and Tablada, Inc., provided the civil/site design and construction stakeout for the Proton Therapy Center addition to the Willis-Knighton Cancer Center. Work included surveying, plotting, mapping and flood plain studies, as well as the design of streets and drainage, sanitary sewer/water mains, and two paved and lighted parking lots, totaling approximately 375 parking spaces.

Scroll to Top