Cockerham Sidewalk and Drainage Improvements

Forte and Tablada, Inc. was responsible for the Preliminary and Final design plans for improvements to Cockerham Road, working with district engineers to develop a safety and enhancement project from LA 16 to Hatchell Road. Improvements included pavement patching and overlay design, hydraulic analysis for installation of storm drain pipe and catch basins, and design of 4,000’ new concrete walkways and drives. Topographic surveying services were completed from Hatchell Road to Range Road. This project enhances the quality of life for the residents and also provides a safe route for walking for visitors and residents of Denham Springs. This sidewalk was tied into the sidewalks that already existed in order to utilize the partial paths.

Service

Market

Location

Livingston Parish, LA

Scroll to Top