Old Hammond Highway – Segment 1

Forte and Tablada, Inc. was responsible for the topographic survey, corridor design study, bridge hydraulic study, and cost estimates for approximately 7,900 feet of four-lane divided concrete curb and gutter roadway with raised median, bridge, roundabout, sidewalks, and subsurface drainage. On this project, Forte and Tablada teamed with Urban Systems to provide a detailed traffic analysis and a roundabout feasibility study. CRA, another instrumental part of the design team, provided the Phase 1 Environmental Site Assessment and wetland delineation report.

 

Service

Location

Baton Rouge, Louisiana

Related Projects

  • LA DOTD Statewide Bridge Scour Analysis

  • Bluebonnet Extension

  • Pendarvis Lane Improvements, Phase I

  • I-49 Connector

Scroll to Top