LSU Laboratory School SRTS Project

Forte and Tablada performed CE&I services utilizing the federal/DOTD process for improving pedestrian facilities, under the statewide Highway Safety Improvement Program, for the for the construction of 0.506 miles of sidewalk located near LSU Laboratory School, from East of its intersection with Highland Rd. to its Junction with Cubs Circle, along W. Lakeshore Dr. at its roundabout with Cubs circle, E. Fraternity Circle, and Dalrymple Dr. The work included concrete ramps, concrete curbs, shared-use path, including pervious pavement, striping, signage, solar rapid flashing beacons, and related work.

Tasks for CE&I services under contract 44-23837 included letting results review/comparison, state project filings, preconstruction meeting, AASHTOWare Project SiteManager & HeadLight work, daily site inspections and work reports, field books, monthly partial estimates, certified payroll review, RFI review and response, change order justification and incorporation into construction design, shop drawing submittal review, quality control, daily contractor & DOTD coordination/management, coordination with design engineer, daily traffic log diary verification, coordination of required samples and testing, as well as production of final materials audit report (2059), and project closeout with DOTD’ final audit.

Service

Location

East Baton Rouge Parish, LA

Related Projects

  • I-10: LA 415 to Essen Lane on I-10 and I-12 Survey

  • South Satsuma Bridge Replacement

  • Bluff Ridge Primary School

  • Jackson Water Well #4

Scroll to Top