George Mashon Rd. and Travis St. Bridge Replacements

Forte and Tablada provided surveying, engineering, and hydraulic analysis services required for the replacement of two timber bridges in Livingston Parish. The existing bridge on George Mashon Road over the Little Natalbany River was replaced with a curved slab span bridge, while the Travis Street over Dumplin Creek bridge was replaced with concrete box culverts. This work included the following tasks:

  • Topographic Survey
  • Hydraulic Analysis
  • Civil Design & Construction Plans Preparation
  • Bridge Design and Load Rating for a Curved Bridge
  • Geotechnical Services
  • Wetlands/Environmental Services
  • Property Surveys ROW Agreements
  • Construction Phase Services