Teal Jones Sawmill

Approx. $150M construction cost. Provided detailed grading, drainage, site geometrics, paving, roadway plan & profile drawings, and structural design for construction of the Teal-Jones Sawmill Facility in Plain Dealing, LA. Site is approximately 240 acres.

Service

Location

Plain Dealing, LA

Related Projects

  • Hatchell Lane Intersection Improvements at US 190 (Florida Blvd.) and LA 1030

  • US Highway 80 Improvements (Traffic Street to Old Shad Road)

  • Belle Chasse Bridge and Tunnel Replacement

  • Nicholson Drive at Brightside Lane Intersection

Scroll to Top