St. John Main Wastewater Pump Station Rehabilitation

Forte and Tablada, Inc. (formerly PEC) was retained by St. John the Baptist Parish to completely rehabilitate the main wastewater lift station. Including removing and replacing existing submersible and self-priming pumps with five new self-priming pumps each capable of pumping 2500 gpm. Project also included a sophisticated bypass plan, concrete rehabilitation and a variable frequency drive control system.