Twelve Mile Bayou’s Pump Station Improvements

Forte and Tablada’s Shreveport office was responsible for the pre-design study, topographic surveys, preliminary plans, and final plans of this project. Advanced Measurements and Modeling was responsible for scanning, modeling, and providing 2-D plans, sections, and elevations for planning and engineering.

Scroll to Top