City of Zachary Elevated Water Tower & System Improvements

Forte and Tablada, Inc. (formerly PEC) was responsible for the design and construction management for a new 500,000 Gallon Elevated Water Tower and associated water system improvements. The projects were designed and bid as follows:

  • Contract 1 provided for the new Elevated Water Tower with associated appurtenances.
  • Contract 2 provided for 12” PVC/HDPE water mains, valves, fittings, fire hydrants, connections, new elevated tank water fill piping, well site piping and associated appurtenances.

This project was funded with State Capital Outlay allocations. Forte and Tablada, Inc. coordinated all aspects of the requirements and reimbursements from the funding agency.

Forte and Tablada, Inc. also coordinated site selection and system hydraulics to ensure that the new tower would provide needed storage and improved pressure throughout the system.

Service

Location

Zachary, LA

Related Projects

  • Madisonville Park Improvements

  • Sherwood-Goodwood Pipeline Project

  • St. John Main Wastewater Pump Station Rehabilitation

  • Camp Minden Regional Training Institute

Scroll to Top