Off-System Bridge Replacements – Whittington Rd over Grays Creek

Forte and Tablada provided surveying, engineering, and hydraulic analysis services required for the replacement of this timber bridge in Livingston Parish. The existing timber bridge on Whittington Road over Grays Creek was replaced with a six-span concrete slab span bridge. As this road is the only access to dozens of homes and a temporary crossing was not feasible due to site constraints, a temporary access road was constructed to provide access to the residents while the bridge was out of service. This required an agreement between the landowners and the Parish, which was facilitated by Forte and Tablada. This work included the following tasks:

  • Topographic Survey
  • Hydraulic Analysis
  • Civil Design & Construction Plans Preparation
  • Wetlands/Environmental Services
  • Property Surveys ROW Agreements
  • Construction Phase Services

Service

Location

Livingston Parish, LA

Related Projects

  • Cockerham Road Sidewalk and Drainage Improvements

  • Hodges Lane Crossdrain Improvements

  • Louisiana Boardwalk

  • Sligo Road Bridge Over Foxskin Bayou

Scroll to Top