Approx. $75M construction cost. Site is approximately 50 acres. Project included paving, drainage, utilities and structural design for a frac sand mine located at the Caddo-Bossier Port for Performance Proppants. Project also included 2 casings bored underneath the Red River since the dredge is located on the opposite side of the river from the processing facility.