Teal Jones Sawmill

Approx. $150M construction cost. Provided detailed grading, drainage, site geometrics, paving, roadway plan & profile drawings, and structural design for construction of the Teal-Jones Sawmill Facility in Plain Dealing, LA. Site is approximately 240 acres.

Service

Location

Plain Dealing, LA

Related Projects

  • LA DOTD Statewide Bridge Scour Analysis

  • Capital Area Pathways (BREC Sidewalks)

  • Pelican State Credit Union HQ

  • Mt. Pleasant Blvd. Widening (Barnett Road to LA 964) and Americana Roundabout

Scroll to Top