Forte and Tablada, Inc. (formerly PEC) was retained by St. John the Baptist Parish to completely rehabilitate the main wastewater lift station. Including removing and replacing existing submersible and self-priming pumps with five new self-priming pumps each capable of pumping 2500 gpm. Project also included a sophisticated bypass plan, concrete rehabilitation and a variable frequency drive control system.



