Bluff Ridge Primary School

Forte and Tablada provides Structural and Electrical Engineering services to Domain Architecture for the Ascension Parish School Board’s Highway 73 New Primary School (APSB Project No. 06316602-101), an approximately 85,300 SF PreK–5th grade facility. Scope includes structural foundation and framing design and electrical power, lighting, and special systems design, together with construction administration including RFIs, shop drawing review, and site visits for both disciplines.

Service

Location

Prairieville, LA

Related Projects

  • Sunny Point Sand Mine

  • I-10: Loyola Interchange Improvements

  • Willis-Knighton – Pierremont Hospital Campus

  • LA 447 Access Management (I-12 – US 190) (Florida Blvd.)

Scroll to Top