Peak Lane Road Improvements

Forte and Tablada provided CE&I services for repairs and improvements of 0.468 miles of road on Peak Lane from its junction with Route US 190 (Florida Blvd.) to its junction with Route LA 1027 (Burgess Ave.). The work associated with this project included clearing and grubbing, drainage structures, milling asphalt concrete, pavement patching, in-place cement stabilized base course, lime treatment, asphalt concrete overlay, and related work.

Service

Location

Walker, LA

Related Projects

  • Off-System Bridge Replacements – Whittington Rd over Grays Creek

  • Caddo-Bossier Port 100k SF Warehouse and Caddo-Bossier Port 40k SF Warehouse

  • Calcasieu River Bridge Monitoring

  • Capital Area Pathways (BREC Sidewalks)

Scroll to Top