Walker City Hall

Forte and Tablada, Inc. Civil Site Engineering. Structural Engineering, and Electrical Engineering services for the 26,000± sq. ft. City Hall building in Walker, LA. Civil Site Engineering included overseeing the expansion of an existing detention pond and associated drainage, parking, geometrics, grading, and site utilities. Structural Engineering included structural steel framing, cmu framing, and shallow foundations for the three-story structure. Electrical Engineering included power, data, access control, and alarm systems for the three story structure including a third-story tenant build-out.

Scroll to Top