Forte and Tablada, Inc. (formerly PEC) was responsible for the design, plan preparation and construction administration for the construction of a new Natural Gas Pipeline and gas regulator station which was designed to meet all applicable requirements of the City of Zachary. Installation included 8” HDPE SDR 11 Gas Main, jack and bore 14” casing (Hwy crossing) including 8” HDPE SDR11 Gas Main, connection of new gas mains to existing high pressure transmission line, including coordination with gas pipeline supplier.

Service

Location

Zachary, LA

Related Projects

  • Caddo-Bossier Port 100k SF Warehouse and Caddo-Bossier Port 40k SF Warehouse

  • Walker City Hall

  • Capital Area Pathways (BREC Sidewalks)

  • Sims Road Improvements