This project involved isolating the existing clear well from the abandoned plant and replacement of all booster station piping, valves, pumps, controls, lighting, and other ancillary equipment.
Each of the three pumps has a 5,000 GPM capacity; modifications included a complete SCADA system capable of monitoring and controlling all major equipment and site security. In addition to station improvements, site improvements included decorative fencing, installation of flow meter and vault and abandonment of the existing intake tunnel.