Plank Road and Kleinpeter Road Sanitary Sewer System Upgrades

Forte and Tablada, Inc. was selected to provide engineering design services for the East Baton Rouge Parish Plank Road – Kleinpeter Road (NGS-C-0002) Sanitary Sewer System Upgrades Project. The scope of this project involves capacity improvements to six gravity and three force main segments located in north Baton Rouge.   As part of the Baton Rouge SSO Program, this project includes services for gravity sewer improvements of approximately 12,500 linear feet of pipeline replacement, ranging from 12” – 42” diameter.  Also included in this design is the replacement of force main pipeline approximately 12,000 linear feet ranging from 8” – 30” diameter.

As part of engineering design services, Forte and Tablada provided site investigations, preliminary design, detailed design, bidding services, and construction engineering services, along with topographical surveys including base-line drawings and preparation of property plats.

Scroll to Top