Forte and Tablada, Inc. provided engineering services for a drainage study of the major drainage watershed in the area. Once the study was completed, construction plans and specifications were developed for conversion of open channel to sub-surface drainage. Construction included removal and replacement of 20’ of roadway with curb and gutter roadway, installation of large diameter metal arch drain pipes, and installation of 1,500’ of drain line and catch basins. Forte and Tablada, Inc. also provided construction inspection services on this project. This project was funded through the HMGP program.
Service
Market
Location
Iberville Parish, LA