Walker Treatment Plant Generator

The scope of this project provided for the entire site at the main wastewater treatment plant in Walker, Louisiana. This generator provided the required power to operate the plant during times of inclement weather and power outages. The design was to install a 600kW diesel driven generator and a sub-base fuel tank with a capacity of 48 hours of run time.

Service

Market

Location

Walker, LA

Scroll to Top