Projects

Holly Drive Bridge Replacement Design

Land Surveying, Structural Engineering, Transportation


Services
Land Surveying
Structural Engineering

Market
Transportation

Location
Covington, LA

Forte and Tablada, Inc.’s Baton Rouge office provided all necessary engineering and related services required for developing plans for the replacement of one bridge in St. Tammany Parish, which is an off-system bridge. The structure was designed to AASHTO LRFD requirements. The bridge contained design and architectural elements, such as stained and/or stamped concrete, wrought iron decorative rails, and a sidewalk to complement its location on the Little Bogue Falaya River.


Similar Projects See All