US 167 to LA 2 (Alt) to Lillie

This project was conducted to improve approximately six miles of Rt. US 167 from an existing two-lane rural roadway to a four-lane divided roadway. In general, the existing two lane roadway was utilized as much as possible. Our firm’s responsibilities included the following tasks:

  • Plan and Profile
  • Geometric Design
  • Drainage Structures Design
  • Plans for Three Slab-Span Bridges
  • Property Line Determinations
  • Right-of-Way Maps

Scroll to Top