News

Bridges near Bluff Creek LA 63

Bridges near Bluff Creek LA 63 Forte and Tablada, Inc. provided all topographic surveying services for three bridge replacements along LA 63 in East Feliciana Parish – Sandy Creek Bridge, McQuinney Bayou, and a tributary to Bluff Creek. S8 Robotic Total Station utilized photogrammetric technology in gathering bridge substructure elements. Service Surveying, Topographic Market Transportation […]

Bridges near Bluff Creek LA 63 Read More »

Old Hammond Highway – Segment 1

Old Hammond Highway – Segment 1 Forte and Tablada, Inc. was responsible for the topographic survey, corridor design study, bridge hydraulic study, and cost estimates for approximately 7,900 feet of four-lane divided concrete curb and gutter roadway with raised median, bridge, roundabout, sidewalks, and subsurface drainage. On this project, Forte and Tablada teamed with Urban

Old Hammond Highway – Segment 1 Read More »

LSU Tennis Facility

LSU Tennis Facility Forte and Tablada, Inc. was retained to provide structural engineering services on the new LSU Tennis Facility. The facility contained new indoor and outdoor competition courts for the LSU tennis team, as well as locker rooms, training rooms, and coaches’ offices. The facility is available to host large tennis tournaments with room for

LSU Tennis Facility Read More »

I-10: Highland Road to LA 73

I-10: Highland Road to LA 73 Forte and Tablada’s Advanced Measurements and Modeling department scanned a total of four bridges: Highland Road, Bayou Manchac Crossing, Bluff Road and LA 73.  The laser scans were tied back to survey coordinates.  Each bridge presented its own unique challenge that had to be overcome on-the-fly. Bluff Road was

I-10: Highland Road to LA 73 Read More »

Lee High School Replacement Project

Lee High School Replacement Project Forte and Tablada, Inc. designed the complete 26-acre site for the construction of the new Lee High School as sub-consultant to GraceHebert Architects. The civil/site design included four buildings, multiple drives, parking lots to accommodate all faculty, buses and students, and a public walking trail to increase connectivity with the

Lee High School Replacement Project Read More »

Warsaw and Blood River Landing Sewer System Upgrade

Warsaw and Blood River Landing Sewer System Upgrade In 2002, Forte and Tablada, Inc. prepared a preliminary engineering report and an environment report indicating that the installation of a sewer collection system and treatment plant would improve public health and safety. By replacing individual homeowners’ sewage treatment plants with a more efficient Central Treatment Plant, the sewage system

Warsaw and Blood River Landing Sewer System Upgrade Read More »

Villaggio Commercial/Residential Development

Villaggio Commercial/Residential Development Forte and Tablada, Inc., provided all of the civil/site design of the infrastructure, concrete streets, parking areas, water and sewer mains, drainage, and stormwater detention for the Villaggio Commercial/Residential Development. This project also included a four-acre pond with a hard edge, as well as two lighted parking lots, landscaped islands, and a

Villaggio Commercial/Residential Development Read More »

Veterans Memorial Boulevard

Veterans Memorial Boulevard The Veterans Memorial Boulevard Extension Project is an important milestone for the Green Light Plan Program as it was the very first of the program to reach construction completion. The roadway opened to traffic on October 2, 2008. The qualified staff of Forte and Tablada, Inc. provided engineering design services for the

Veterans Memorial Boulevard Read More »

Scroll to Top